Frequently Asked Questions Regarding Forms CI-D and CI-X
Only list the oil lease number.
The lease location can be denoted by the gate entrance to the lease.
The forms do not currently require designating the location of a pipeline itself. You only need to identify the location of the associated compressors, control centers, regulator stations, and/or meter stations.
Yes.
No. If you intend to apply for an exception, only file Form CI-X. If you are seeking an exception for more than one facility, list all of the facilities on a single Form CI-X attachment. Be sure to include a written justification for the exception for each facility listed and to submit the $150.00 filing fee. The filing fee is applicable for each Form CI-X– there is not a separate fee for the attachment. Make sure the Form CI-X is filed by the same deadline as the deadline for the CI-D. The first deadline is January 15, 2022.
Sec. 25.52(h)(1)
A searchable and downloadable list is available at this link (under Critical Natural Gas):
https://www.puc.texas.gov/industry/electric/directories/Default.aspx
Utility dual feed capability refers to the ability of a customer to receive electric service from two or more independent sources.